Bisco Engineering Inc
5 out of 5 based on 1 user reviewwrite a review
2609 Westview Dr
North Vancouver BC, V7N 4M2
Sun | closed |
Mon | 8:00 am-5:00 pm |
Tue | 8:00 am-5:00 pm |
Wed | 8:00 am-5:00 pm |
Thu | 8:00 am-5:00 pm |
Fri | 8:00 am-5:00 pm |
Sat | closed |
About Bisco Engineering Inc
Products Carried: Bridge Design in Vancouver, BC
Cable Stayed Bridges Vancouver, BC
Post-Tensioned Concrete Design Vancouver, BC
Structural Steel Design Vancouver, BC
Substructure and Foundation Design in Vancouver, BC
Conceptual Designs in Vancouver, BC
Quality Control in Vancouver, BC
Reviewing and Checking in Vancouver, BC
Canadian and US Projects in Vancouver, BC
Team Member Vancouver, BC
Professional Affiliations: • Max Bischof was recently involved in the following projects:
o 2008: Golden Ears Cable Stayed Bridge, Langley, BC, Canada
o 2010 to 2011: Port Mann Cable Stayed Bridge, New Westminster, BC, Canada
o 2009 to 2012: Retrofit of Ruskin Dam in Mission, BC, Canada
o 2013 to 2014: Ohio River Bridge in Louisville, Kentucky, USA
o 2013: St. Croix Crossing in Minnesota, USA
Languages Spoken: English